Still not sure when we will make the move but I’m hoping for the beginning of Aug. Of course I will let you know as soon as I know.
The cabinets are starting to go in, which is one of the last things to do in the renovations. This is the Sterilization and General Storage area which will be the only place with white cabinets. All the others will be in a bamboo wood laminate. So far, only one of them needs adjustment.
After that there will be minor electrical and plumbing to finish as well as the final coats of paint.
The tile mix-up has been resolved and I think the result looks great. The darker tile on the floor was definitely the way to go. It’s just so darn pretty.
I don’t know about you but packing is not on my list of fun. However, it’s better to get as much done ahead of time as possible so we’re filling up boxes whenever we have a spare moment. Wendy is an adamant organizer so we are decluttering as we go. She’s gotten me to let go of a lot of stuff. Thank you Wendy.
This last bit before we get Our Certificate of Occupancy is a bit nerve racking because the changes are small so it seems to slow down. But moving everything will be CRAZY busy and exhausting so we need to relish the down time now.
Hope all of you are having a wonderful summer and will be happy and healthy in the week to come. Visit our dentist in Knoxville today!